
Lubanowo Photovoltaic Farm 12 MW
The Elmont is building 12 MW photovoltaic power in Lubanowo. As part of the investment, the construction and detailed design documentation has already been prepared, and

The Elmont is building 12 MW photovoltaic power in Lubanowo. As part of the investment, the construction and detailed design documentation has already been prepared, and

The Elmont will build a 40 MW photovoltaic farm in the Chotków turnkey formula for a foreign investor. As part of the project, electricity will be

The Elmont Grup is implementing another project related to photovoltaics. For the purposes of connecting the Augustynka 1 photovoltaic power plant with a capacity of 25

The Elmont, commissioned by PGE, will carry out a comprehensive modernization and extension of the 110/15 kV Wyszków power station along with HV and MV

Today, the Job Fair at the Białystok University of Technology! We invite students to our stand (No. 4) in the building of the Modern Education

Elmont Grupa always implements projects comprehensively. The Banie III Wind Farm already produces clean electricity, and soon another wind farm Banie IV will join it. However, for the

Enea once again trusted the Elmont Group and entrusted us with the construction of a photovoltaic farm with a total capacity of 5MW. Over 6,200 panels will be located

The wind farm in Gostynin is being built on schedule. So far, we have already built a MV cable line, fiber optic line as well as

We are pleased to announce that the project of rebuilding the existing power station for PGE in Dylewo, implemented by Elmont Grupa, has reached another important

Ordering part: PGE Dystrybucja S.A. Branch Białystok Period of implementation: 2016 Scope of works: the development of construction and executive as well as design documentation as agreed