Elektromontaż Wschód has completed the turnkey construction of the PT Kietlanka 110/15/3 kV traction substation, a 0.5 km WN double-circuit cable line with a pipe pole and a 110 kV RS Kietlanka network switch station.

The scope of work included:

  • construction of a railway building – PT traction substation,
  • construction of internal roads and the exit from the municipal road,
  • construction of sanitary installations, a rainwater drainage and a water supply connection,
  • construction of a telecommunication connection with starting communication,
  • construction of well foundations,
  • installation and commissioning of a fire protection, anti-burglary and monitoring installations, electrical installations,
  • delivery and assembly of 15kV switchgear,
  • delivery and assembly of 3 kV switchgear,
  • delivery and assembly of 110kV switching station in a compact design,
  • delivery, assembly and commissioning of communication devices,
  • construction and insertion of a fibre-optic cable to the substation,
  • delivery, assembly and connection of an overhead transformer station,
  • construction of the RS network switching station building,
  • delivery and assembly of HV devices along with assembly of primary circuits.

Share

See more

Energy infrastructure

New GIS 110kV for EON

Consortium of companies Elmont Sp. z o. o. and Pracownia Projektowa Enspro Sp. z o. o. will develop executive documentation and build a 110 kV

Photovoltaic farms

Photovoltaic farms with a total capacity 4MW

Elmont, together with Pracownia Projektowa Enspro, will design and build photovoltaic farms with a total capacity of 4 MW.The scope of work includes the preparation

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top