Elektromontaż Wschód is modernizing the 110 / 15kV GPZ Lewkowo substation. The works are being carried out on a working station. The expansion of the 110kV switchgear from the H1 system to the H4 system along with the installation of new follow-up compensation devices includes the:

  • construction of TR2, TPW2 stations, modernization of TPW1,
  • construction of teletechnical sewage system,
  • construction of the HV bay no 4 of the TR2 transformer,
  • modernization of HV bays no.1, 2, 3, 5,
  • modernization of MV bays no.2, 11, 15, 16, 21,
  • overvoltage of the MV Hajnówka line from bay 16 to bay 21,
  • delivery and replacement of FS cable cabinets in the HV switching station,
  • delivery and assembly of FR1, FR4, FR5 security cabinets,
  • rebuilding of FR2, FR3 security cabinets,
  • commissioning works and checking the operation of security of all switchgear bays,
  • modernization of the telemechanics cabinet,
  • modernization of the telemechanics system along with the delivery of materials and devices, works related to the configuration, start-up and checking for the central dispatching supervision system BTC PRINS,
  • installation of the differential protection and concurrency of the distance protection at Hajnówka and Michałowo stations,
  • rebuilding of the FQ energy measurement cabinet,
  • execution of systems as well as delivery and assembly of Technical Equipment Standard and the Technical Protection System cabinets,
  • replacement of external lighting lamps,
  • construction of an internal road and rainwater drainage.

Share

See more

Energy infrastructure

110/15 kV GPZ Piątek

Alongside investments in renewable energy sources, Elmont is carrying out strategic infrastructure projects for the Distribution System Operator (DSO).One of these projects is the construction

Photovoltaic farms

18 Photovoltaic Farms 30MW

Elmont, as the general contractor, is starting the implementation of a large photovoltaic investment in western Poland.As part of the project, photovoltaic farms with capacities

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top