GPZ 110 / 15kV Radzikowice for TAURON

Elmont Grupa – Infrastruktura Energetyczna

The construction of the 110 / 15kV Radzikowice substation in the Nysa municipality in the “design and build” formula is carried out by a consortium of companies from the Elmont Group. The design of the station was made by the Enspro design studio, which had previously designed for Tauron Dystrybucja. Elektromontaż Wschód, the consortium leader, is carrying out other works. These works include, among others, AIS 14-bay double-system HV switchgear and 30-bay MV switchgear, which are already being completed.

The facility will supply business entities that will be located in the Wałbrzych Special Economic Zone in Radzikowice, in the Nysa municipality, in the Opolskie Voivodeship.

Share

See more

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

Farma fotowoltaiczna
Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top