Feed mixing plant PZZ Wałcz in Piła

Elmont Grupa – Inwestycje przemysłowe

As part of the contract, Elektromontaż Wschód performed works in the field of power supply, electrical and teletechnical installations as well as I&C technological installations.

Scope of works:

  • delivery and installation of the main power station,
  • delivery and assembly of medium voltage switchgear in the main power station,
  • delivery and assembly of medium voltage cable bridge (connection of transformers with MV switchgear),
  • delivery and assembly of 5 cable connectors,
  • delivery and assembly of 2 dry resin transformers with a capacity of 3150 kVA,
  • delivery and assembly of the main substation’s low voltage switchgear,
  • delivery and installation of 2 capacitor banks with a capacity of 500 kVA for the purposes of reactive power compensation,
  • delivery and assembly of object electrical switchgears,
  • delivery and assembly of cable routes for electrical and technological installations,
  • delivery and assembly of wiring for technological installations,
  • delivery and assembly of internal power lines for object switchgears,
  • delivery and assembly of wiring for lighting and power installations,
  • supply and installation of general indoor lighting,
  • delivery and installation of emergency and evacuation lighting,
  • delivery and assembly of electrical installation equipment,
  • delivery and assembly of lightning protection and earthing systems,
  • delivery and assembly of low-voltage installations,
  • performing measurements and post-assembly tests,
  • preparation of as-built documentation.

Share

See more

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

Farma fotowoltaiczna
Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top