110/15kV station Mikołajki

Elmont Grupa – Infrastruktura Energetyczna

Elektromontaż Wschód, as a general contractor, carried out a comprehensive modernization of the station.


The scope of work included:

  • part concerning land development and construction,
  • sanitary installations,
  • high voltage primary circuits,
  • medium voltage primary circuits,
  • high voltage secondary circuits,
  • medium voltage secondary circuits,
  • measurement of electric energy,
  • telemechanics and telecommunications,
  • technical protection system of the station,
  • full reconstruction of the 110kV switchgear, 110kV bays equipped with Hypact modules and the modernization of the 15kV switchgear,
  • construction of new stations for own needs,
  • construction of new capacitor bank stations,
  • construction of roads, communication routes and the station drainage system,
  • reconstruction of auxiliary switchgear and 110 kV control room,
  • installation of an area protection system (monitoring, alarm, traffic barriers), in addition, a ventilation and air-conditioning system has been installed in the building.

Share

See more

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

Farma fotowoltaiczna
Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top