Modernization of the 20/20 kV RS 1 Suwałki station

Elmont Grupa – Infrastruktura Energetyczna

Ordering Party: PGE Dystrybucja S.A. Oddział Białystok

Implementation period: 2015

Scope of work:

  • updating technical documentation for security communication in the engineering channel,
  • execution of a complete station telemechanics system in accordance with the updated technical documentation,
  • delivery of materials and equipment as well as all related configuration and commissioning works,
  • calculation and introduction of EAZ settings and performance of functional tests of automation of each MV switchgear bay modernized in this scope,
  • development of telemechanics address lists,
  • launching communication channels to the local and central BTC PRINS dispatch supervision system as well as the engineering supervision channel,
  • performing functional tests of the entire telemechanics system, including communication with the local and central BTC PRINS dispatcher supervision system and in the engineering supervision channel,
  • development of as-built documentation,
  • development of operating instructions for the constructed telemechanics system.

Share

See more

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total