Rebuilding of the HV / MV station in Czarna Białostocka

Elmont Grupa – Infrastruktura Energetyczna

Elektromontaż Wschód has rebuilt the 110/6 kV station in Czarna Białostocka.

The scope of works included:

  • the demolition of existing buildings, structures and equipment in accordance with technical documentation and demolition permit,
  • the construction and assembly works in accordance with technical documentation and building permit,
  • the assembly and commissioning of all devices provided for in the project,
  • the execution of a complete station telemechanics system in accordance with technical documentation, including the delivery of materials and devices and all related configuration and commissioning works,
  • entering the settings into the built-in devices and carrying out the commissioning checks of all equipped switchgear bays in accordance with the approved commissioning program and their confirmation with protocols,
  • performing tests and functional tests of the entire telemechanics system, including communication with the local and central BTC PRINS dispatcher supervision system and in the engineering supervision channel,
  • the development of as-built documentation,
  • the development and approval of the Station Operation Manual by the Operator.

Share

See more

GPZ Bielin i GPZ Chojna
Energy infrastructure

GPZ Bielin and GPZ Chojna

Elmont, commissioned by Enea Operator, will carry out a comprehensive modernization of two 110/15 kV power stations in the West Pomeranian Voivodeship – GPZ Bielin

Energy infrastructure

110/15 kV GPZ Piątek

Alongside investments in renewable energy sources, Elmont is carrying out strategic infrastructure projects for the Distribution System Operator (DSO).One of these projects is the construction

Photovoltaic farms

18 Photovoltaic Farms 30MW

Elmont, as the general contractor, is starting the implementation of a large photovoltaic investment in western Poland.As part of the project, photovoltaic farms with capacities

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.