As part of the contract, Elektromontaż Wschód performed works in the field of power supply, electrical and teletechnical installations as well as I&C technological installations.
Scope of works:
- delivery and installation of the main power station,
- delivery and assembly of medium voltage switchgear in the main power station,
- delivery and assembly of medium voltage cable bridge (connection of transformers with MV switchgear),
- delivery and assembly of 5 cable connectors,
- delivery and assembly of 2 dry resin transformers with a capacity of 3150 kVA,
- delivery and assembly of the main substation’s low voltage switchgear,
- delivery and installation of 2 capacitor banks with a capacity of 500 kVA for the purposes of reactive power compensation,
- delivery and assembly of object electrical switchgears,
- delivery and assembly of cable routes for electrical and technological installations,
- delivery and assembly of wiring for technological installations,
- delivery and assembly of internal power lines for object switchgears,
- delivery and assembly of wiring for lighting and power installations,
- supply and installation of general indoor lighting,
- delivery and installation of emergency and evacuation lighting,
- delivery and assembly of electrical installation equipment,
- delivery and assembly of lightning protection and earthing systems,
- delivery and assembly of low-voltage installations,
- performing measurements and post-assembly tests,
- preparation of as-built documentation.