Elmont will build a 50 MW energy storage facility with a capacity of 120 MWh, along with all necessary supporting infrastructure, in the Podkarpackie Province.
In order to connect the energy storage facility to the distribution grid, the Company will also construct a 110/33 kV GPO subscriber substation and subsequently connect the completed facilities to the high-voltage (HV) grid.
The scope of the project also includes the construction of a 3-circuit MV connection, the installation of 9 PCS transformer units and 18 DC SmartStack units, the implementation of full facility automation, as well as integration with the operator systems operating within the DSO’s territory.
Additionally, the scope of work includes:
• preparation of detailed design documentation and a substitute construction design for both facilities,
• construction of a perimeter fence for the project site,
• construction of cable ducts and a drainage system for the transformer pits,
• installation of a fire alarm system and CCTV,
• construction of an exit ramp, access roads, and internal roads.
The planned date for connecting the energy storage facility to the grid is April 2027.