We are pleased to announce a new Elmont contract for the design and construction of a 4.4 MW photovoltaic farm for a foreign investor.
The works will include the preparation of detailed designs and the construction of a photovoltaic farm using free-standing assembly systems with a tracking system.
The scope of work also includes the execution of electricity connections from the farm, the construction of a transformer station and a 15 kV cable line with a length of approximately 710 m, connection of the infrastructure to the DSO network, as well as obtaining all network permits related to network codes. The first energy from the farm will flow in the second half of 2024.