Modernization of the 110 kV Suwałki HV line

Elmont Grupa – Infrastruktura Energetyczna

Ordering part: PGE Dystrybucja S.A. Branch Białystok

Period of implementation: 2016

Scope of works:

  • the development of construction and executive as well as design documentation as agreed with the ordering party,
  • obtaining a valid building permit,
  • the construction of the HV 110 kV cable line,
  • the replacement of existing poles with 110 kV cable poles,
  • the assembly of 110 kV cable terminations,
  • disassembly of 110 kV poles,
  • the measurements of the HV 110kV line and as-built documentation.

Share

See more

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top