Ordering part: PGE Dystrybucja S.A. Branch Białystok

Period of implementation: 2016

Scope of works:

  • the development of construction and executive as well as design documentation as agreed with the ordering party,
  • obtaining a valid building permit,
  • the construction of the HV 110 kV cable line,
  • the replacement of existing poles with 110 kV cable poles,
  • the assembly of 110 kV cable terminations,
  • disassembly of 110 kV poles,
  • the measurements of the HV 110kV line and as-built documentation.

Share

See more

Energy infrastructure

110/15 kV GPZ Piątek

Alongside investments in renewable energy sources, Elmont is carrying out strategic infrastructure projects for the Distribution System Operator (DSO).One of these projects is the construction

Photovoltaic farms

18 Photovoltaic Farms 30MW

Elmont, as the general contractor, is starting the implementation of a large photovoltaic investment in western Poland.As part of the project, photovoltaic farms with capacities

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top