Iława Wind farm 12 MW

Elmont Grupa – Farmy Wiatrowe

Ordering Party: STEAG GmbH, Germany

Implementation period:  2013 – 2014

Scope of work:

  • development of executive documentation,
  • construction of access roads and maneuvering areas,
  • construction of foundations for wind turbine towers,
  • supervision over assembly of Vestas V112-3MW wind turbines,
  • construction of MV cable lines,
  • construction of a fiber optical network,
  • assembly and commissioning of the R-SN-KOMPENSACJA container compensation station with devices for capacitive reactive power compensation,
  • installation and commissioning of the R-MV container distribution station for the needs of automation and security of the wind farm operation with elements of the measurement data transmission system to the Main Power Supply Point in Iława and the Investor’s SCADA system,
  • commissioning of MV switchgears located in wind turbines,
  • installation and commissioning of a telemetry and telemechanics system for the purposes of automation and security of wind farm operation,
  • delivery and commissioning of SSWiN, KD and CCTV installations along with a set of internet connections,
  • obtaining a permit to use the facility.

Share

See more

Energy infrastructure

110/15 kV GPZ Piątek

Alongside investments in renewable energy sources, Elmont is carrying out strategic infrastructure projects for the Distribution System Operator (DSO).One of these projects is the construction

Photovoltaic farms

18 Photovoltaic Farms 30MW

Elmont, as the general contractor, is starting the implementation of a large photovoltaic investment in western Poland.As part of the project, photovoltaic farms with capacities

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top