PV Lubno 5MW for ENEA

OZE Energia odnawialna, Farmy Fotowoltaiczne Elmont Grupa

Elmont, together with design studio Enspro, will design and build 5MW Lubno photovoltaic farm for ENEA Nowa Energia in the formula: „design&build”.

The scope of work includes preparation of replacement design, building designs and construction of a new 5MW photovoltaic farm. As part of the project, we will also make 15 kV cable outlets and connect the infrastructure to the existing network related to the wind farm, thanks to which a specific infrastructure for the energy mix of two renewable energy sources will be created. The deadline for putting the photovoltaic farm into operation is the beginning of 2023.

Share

See more

Energy infrastructure

110/15 kV GPZ Piątek

Alongside investments in renewable energy sources, Elmont is carrying out strategic infrastructure projects for the Distribution System Operator (DSO).One of these projects is the construction

Photovoltaic farms

18 Photovoltaic Farms 30MW

Elmont, as the general contractor, is starting the implementation of a large photovoltaic investment in western Poland.As part of the project, photovoltaic farms with capacities

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

See our projects