Solar 100 MW with GPO Substation

OZE Energia odnawialna, Farmy Fotowoltaiczne Elmont Grupa

Elmont Grupa participates in the implementation of another, one of the largest photovoltaic farms in Poland with a total capacity of 100 MWp. The production of this power plant at the level of about 100 thousand MWh will allow to meet the demand  for electricity of more than 40 thousand households.

Our design studio Enspro has developed for one of the largest investors in the RES industry, the construction desing of photovoltaic power plant with a capacity of 50 MWp (stage I) with accompanying infrastructure and GPO Substation 30/110kV. The investment is located in the Podkarpackie voivodship. The power plant covers an area of 44.15 ha, the length of MV cable lines was 15 km. In addition, the Enspro design studio, commissioned by PGE Dystrybucja Branch Rzeszów, has prepared a complete construction and Execution design of the 110/15kV Substation, to which the photovoltaic power plant will be connected and obtained all the necessary and required permits and arrangements.

Share

See more

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

See our projects