Elmont energized the RS 110 kV Różyna, which will allow the introduction of the power generated by the Sępopol Wind Farm to the ENERGA Operator power system. Currently, thanks to connecting the voltage to the switch station, the process of commissioning individual wind turbines is in progress.

Energy infrastructure
SMART GRID for ENEA
Commissioned by ENEA Operator sp. z o.o., Elmont built a Smart Power Grid in Szczecin, Gryfino district and Świnoujście. The investment included the modernization and