Photovoltaic Farm Chwiram 1MW

Elmont Grupa – Farmy Fotowoltaiczne

Elmont Grupa was chosen by the Investor as the General Contractor of a 1 MWp Photovoltaic Plant with the necessary technical infrastructure in Zachodniopomorskie Voivodeship.

The project aims to implement, commissioning and putting into operation a photovoltaic farm, which will consist of over 3,000 stand-alone photovoltaic modules with DC inverters mounted on racks with the structure anchored in the ground, and a grid connection with the installation (including a transformer station container, MV cable, connection to the existing MV 15 kV overhead line).

The deadline for the construction is October 31, 2021.

Share

See more

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

Farma fotowoltaiczna
Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top