Double-circuit 110kV overhead line for TAURON

Elmont Grupa – Infrastruktura Energetyczna

At the request of TAURON, Elektromontaż Wschód will rebuild the double-circuit 110 kV overhead line into single-track lines (overhead and underground) from the pylons to the Ząbkowice GPZ.

The scope of work includes:

a) reconstruction of the 110 kV S-293 overhead line,

b) reconstruction of the 110 kV S-208 overhead line, including the construction of a pylon,

c) construction of a 110kV cable line,

d) construction of optical fibre line.

Share

See more

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top