At the request of TAURON, Elektromontaż Wschód will rebuild the double-circuit 110 kV overhead line into single-track lines (overhead and underground) from the pylons to the Ząbkowice GPZ.

The scope of work includes:

a) reconstruction of the 110 kV S-293 overhead line,

b) reconstruction of the 110 kV S-208 overhead line, including the construction of a pylon,

c) construction of a 110kV cable line,

d) construction of optical fibre line.

Share

See more

Energy infrastructure

110/15 kV GPZ Piątek

Alongside investments in renewable energy sources, Elmont is carrying out strategic infrastructure projects for the Distribution System Operator (DSO).One of these projects is the construction

Photovoltaic farms

18 Photovoltaic Farms 30MW

Elmont, as the general contractor, is starting the implementation of a large photovoltaic investment in western Poland.As part of the project, photovoltaic farms with capacities

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable