Ujazd 30 MW Wind Farm

Elmont Grupa – Farmy Wiatrowe

The Elmont Group was selected by a foreign investor as the general contractor of the power part for the purposes of 30 MW power evacuation from the wind farm, which will include 15 Siemens Gamesa 2MW turbines, located in the Opolskie Voivodeship.

The scope of work includes the expansion of the 110/15 kV Grodziska GPZ station, construction of the 210 m HV cable line and the 30/110 kV GPO station, the development of detailed designs for the above scope, the performance of flow analyzes for the Ujazd wind farm, commissioning in accordance with the NC RfG network codes, and the performance of operational permit procedures for type D power generating modules (EON, ION, FON).

Share

See more

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

Farma fotowoltaiczna
Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top