Ujazd 30 MW Wind Farm

Elmont Grupa – Farmy Wiatrowe

The Elmont Group was selected by a foreign investor as the general contractor of the power part for the purposes of 30 MW power evacuation from the wind farm, which will include 15 Siemens Gamesa 2MW turbines, located in the Opolskie Voivodeship.

The scope of work includes the expansion of the 110/15 kV Grodziska GPZ station, construction of the 210 m HV cable line and the 30/110 kV GPO station, the development of detailed designs for the above scope, the performance of flow analyzes for the Ujazd wind farm, commissioning in accordance with the NC RfG network codes, and the performance of operational permit procedures for type D power generating modules (EON, ION, FON).

Share

See more

Enea Smart Grid - Elmont - infrastruktura energetyczna
Energy infrastructure

SMART GRID for ENEA

Commissioned by ENEA Operator sp. z o.o., Elmont built a Smart Power Grid in Szczecin, Gryfino district and Świnoujście. The investment included the modernization and

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top