The Elmont Group, commissioned by a foreign investor, will build electricity infrastructure for a 55,2 MW wind farm, which will include 16 wind turbines. The scope of works provides comprehensive implementation in the “Design and build” formula and will include the development of replacement construction and executive designs, construction of the 110 kV cable line and 110 / 30kV GPO station, as well as the extension of the 220/110 / 30kV GPZ station. In addition, we will conduct flow analyzes for the client, start-up the farm in accordance with the NC DC and NC RfG network codes, and perform all operational permit procedures, including for type D power generation modules (EON, ION, FON), in agreement with PSE.

Power FW:                               55,2 MW

Number of FW Turbines:      16 x Vestas V126/3,45 MW

Share

See more

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

Farma fotowoltaiczna
Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm