Wind Farm Banie IV 56 MW

Elmont Grupa – Farmy Wiatrowe

The Elmont Group, commissioned by a foreign investor, will build electricity infrastructure for a 55,2 MW wind farm, which will include 16 wind turbines. The scope of works provides comprehensive implementation in the “Design and build” formula and will include the development of replacement construction and executive designs, construction of the 110 kV cable line and 110 / 30kV GPO station, as well as the extension of the 220/110 / 30kV GPZ station. In addition, we will conduct flow analyzes for the client, start-up the farm in accordance with the NC DC and NC RfG network codes, and perform all operational permit procedures, including for type D power generation modules (EON, ION, FON), in agreement with PSE.

Power FW:                               55,2 MW

Number of FW Turbines:      16 x Vestas V126/3,45 MW

Share

See more

Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

Energy infrastructure

Energy Storage 400 MWh

Enspro will carry ou the project, obtaining a permit for the construction of the HEP2 Battery Electricity Storage with a capacity of 200MW and a

Farma fotowoltaiczna Elmont
Photovoltaic farms

20 MW PV farm

Elmont is starting the construction of its next high-power photovoltaic farm. This time, at the request of a foreign investor in the Design and Build

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top