On the order of Energa, our company Elektromontaż Wschód will rebuild the main 110 / 15kV power station supplying the historic Masurian city of Szczytno. The modernization will replace the old station with a new one with modern modular solutions. Thanks to this investment, energy losses will decrease, the reliability of power supply to the city and the possibility of connecting green energy producers will increase, which will contribute to maintaining the charms of this tourist town.

The design documentation was previously developed by our other company, i.e. Pracownia Projektowa Enspro, and now Elektromontaż Wschód will “finish the work”.

Source: https://miastoszczytno.pl/

Share

See more

Energy infrastructure

110/15 kV GPZ Piątek

Alongside investments in renewable energy sources, Elmont is carrying out strategic infrastructure projects for the Distribution System Operator (DSO).One of these projects is the construction

Photovoltaic farms

18 Photovoltaic Farms 30MW

Elmont, as the general contractor, is starting the implementation of a large photovoltaic investment in western Poland.As part of the project, photovoltaic farms with capacities

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable