Construction of 110/15 / 1.3kV Dobczyn traction substation

Elmont Grupa – Infrastruktura Energetyczna

Elektromontaż Wschód, as a general contractor, will build Traction Substation Dobczyn with power evacuation for railways under the government program MUZA III and MUZA IV.

The scope of work includes:

  • construction of internal roads,
  • construction of the station’s external fence,
  • construction of foundations:
  • 110/15 / 1.3 / 1.3 kV transformer stations,
  • transformer stations for own needs,
  • grounding assembly stations,
  • shunt reactor positions,
  • foundations and supporting structures for 110kV equipment,
  • external sanitary installations and drainage of transformer stations with an oil separator, pump and tank for evaporation of treated drips,
  • execution of a water supply connection,
  • execution of a sewage connection,
  • construction and assembly of installations and outdoor lighting,
  • delivery and assembly of devices in a 15kV switchgear,
  • making connections between devices in the 15kV switching station,
  • delivery and assembly of 110/15 / 1.3 / 1.3 kV transformer and for own needs,
  • delivery and assembly of grounding units,
  • supply of primary 110kV and secondary 110kV devices,
  • assembly of 110kV equipment,
  • construction of a 110kV power line with an fibre-optic line,
  • cable connections of 3 kV power supplies, return cables, control of disconnectors of the traction network with fibre-optic line,
  • rebuilding of the telecommunications cable,
  • connection of fibre-optic line to traction substations.

Share

See more

Energy infrastructure

110/15 kV GPZ Piątek

Alongside investments in renewable energy sources, Elmont is carrying out strategic infrastructure projects for the Distribution System Operator (DSO).One of these projects is the construction

Photovoltaic farms

18 Photovoltaic Farms 30MW

Elmont, as the general contractor, is starting the implementation of a large photovoltaic investment in western Poland.As part of the project, photovoltaic farms with capacities

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top