GIS 110/6/0,5/0,4 kV for Polska Grupa Górnicza S.A.

Elmont Grupa – Infrastruktura Energetyczna

We are implementing an investment agreement called Construction of the GST 110/6 / 0.5 / 0.4 kV Paniowy power station with accompanying infrastructure in the area of shaft VI for the needs of PGG S.A.

The scope of works includes the comprehensive turnkey implementation: from designing and obtaining permits, to the construction and commissioning of the station.

It is another project of the Elmont Group made in GIS technology. SF6 gas insulated switchgears are compact, reliable and economical solutions used in special conditions – in areas with high population density, in places with exceptional architectural and environmental values. The technology used allows reducing the built-up area and the impact on the environment by installing a compact device inside the building.

The project will provide additional strengthening of the station building due to its location in the mining area.

The investment will be carried out jointly by Elektromontaż Wschód and Pracownia Projektowa Enspro, companies belonging to the Elmont Group.

In the photo: 110 / 15kV Kolno substation made in gas insulation (GIS) by Elektromontaż Wschód.

Share

See more

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

Farma fotowoltaiczna
Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top