GPZ Kolno with a two-system GIS 110kV switchgear

Elmont Grupa – Infrastruktura Energetyczna

Elektromontaż Wschód, as the general contractor, has comprehensively modernized the 110/15 kV Kolno power substation. It is the first indoor, two-system 110kV GIS switchgear in the voivodship.

The scope of work included the:

  • modernization of the 110 / 15kV GPZ Kolno substation in GIS technology,
  • turnkey modernization of the 110 / 15kV GPZ Kolno substation. Works on an active station based on the developed WRI,
  • HV switchgear made as indoor in GIS technology, 8-field, 2-section,
  • construction of two new 16 MVA power transformer stations,
  • construction of new line gates for the HV Łyse, Pisz, Biała Piska and Łomża lines 2,
  • execution of HV cable lines connecting HV switchgear of GIS type with HV lines incoming to line gates and to power transformers,
  • construction of a 15kV busbar wire bridge,
  • construction of two new transformer stands for own purposes with chokes with follow-up regulation and modernization of 15 kV bays,
  • construction of a 110 kV switchgear building with the entire infrastructure,
  • construction of teletechnical sewage system,
  • delivery, assembly and commissioning of auxiliary cabinets,
  • delivery, assembly and commissioning of FR security cabinets,
  • execution of the Technical Protection System,
  • construction of area lighting, fibre optic lines and lightning protection system,
  • execution of sanitary installations,
  • construction of roads and station fencing,
  • disassembly of old equipment of 110kV switching station.

Share

See more

Energy infrastructure

110/15 kV GPZ Piątek

Alongside investments in renewable energy sources, Elmont is carrying out strategic infrastructure projects for the Distribution System Operator (DSO).One of these projects is the construction

Photovoltaic farms

18 Photovoltaic Farms 30MW

Elmont, as the general contractor, is starting the implementation of a large photovoltaic investment in western Poland.As part of the project, photovoltaic farms with capacities

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top