Zakłady Chemiczne Police S.A.

Elmont Grupa – Inwestycje przemysłowe

The comprehensive investment implementation consisting in the design, delivery, assembly and commissioning of a 6kV switchgear with a 6kV 750kW soft start motor.

Ordering party: Grupa Azoty Zakłady Chemiczne Police S.A.

Scope of works:

  • preparation of executive design documentation,
  • preparation of the room for installation of a 6kV switchgear,
  • delivery and assembly of a 6kV switchgear in building 570B,
  • execution of terminals and connection of existing 6kV cables to the feeder busbar,
  • connection of existing control cables and fibre optic line,
  • delivery, installation and connection to the switchgear a soft start system (soft start), a 6 kV 750 kW engine,
  • tests and measurements after assembly and commissioning of the switchgear,
  • providing as-built and quality documentation.

Share

See more

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total