Wind Farm Miksztal 10 MW

Elmont Grupa – Farmy Wiatrowe

Ordering party: Alstal Construction Group

Period of implementation:  2014- 2015

Scope of works:

  • the delivery, construction and commissioning of MV cable lines with technical infrastructure,
  • the delivery, construction and commissioning of fibre optic cable lines along with technical infrastructure,
  • connecting the wind farm to the NPS along with the procedure carried out before the distribution system operator,
  • activities related to the acceptance and commencement of investments in the scope of completed power industry works,
  • preparation of as-built documentation along with geodetic inventory as well as operation and maintenance instructions with arrangements with the network operator in the field of energy.

Share

See more

Enea Smart Grid - Elmont - infrastruktura energetyczna
Energy infrastructure

SMART GRID for ENEA

Commissioned by ENEA Operator sp. z o.o., Elmont built a Smart Power Grid in Szczecin, Gryfino district and Świnoujście. The investment included the modernization and

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top