Giże Biogas Plant

Elmont Grupa – Inwestycje przemysłowe

Biogas plant with a capacity of 1.063 MW in Zajdy near Olecko, Warmian-Masurian Voivodeship.

Ordering party: Eco-Progres Sp. z o.o.

Period of implementation:  2013 – 2014

Scope of works:

  • MV overhead connection of the biogas plant to the supply network,
  • construction of a MV cable line,
  • the assembly and commissioning of a container transformer station with green energy measurement systems,
  • the construction of a power supply network for technological devices,
  • the construction of an external lighting installation for the biogas plant,
  • construction of a lightning protection system,
  • carrying out acceptance activities before the distribution system operator,
  • participation in the technological start-up of a biogas plant.

Share

See more

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total