Modernization of the MV switching station of the 110/15 kV Nida

Elmont Grupa – Infrastruktura Energetyczna

Ordering party: PGE Dystrybucja S.A.

Period of implementation: 2014

Scope of works:

  • execution of construction and assembly works,
  • configuring and starting the protection relay communication,
  • calculating and entering the settings into the protection relay,
  • carrying out functional tests of telemechanics from the local level and from the central dispatch supervision system and the communication in the engineering supervision channel,
  • the updating of existing Station Operating Instructions and diagrams,
  • basic works related to the changes introduced at the stations.

Share

See more

Energy infrastructure

110/15 kV GPZ Piątek

Alongside investments in renewable energy sources, Elmont is carrying out strategic infrastructure projects for the Distribution System Operator (DSO).One of these projects is the construction

Photovoltaic farms

18 Photovoltaic Farms 30MW

Elmont, as the general contractor, is starting the implementation of a large photovoltaic investment in western Poland.As part of the project, photovoltaic farms with capacities

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable