Elektromontaż Wschód, as a general contractor, has completed the works covering the design, construction and commissioning of auxiliary stations equipped with automatic follow-up compensation at the 110 / 15kV Kotuń station and replacement of compensation units at the Łuków station.

The scope of works included the :

  • modernization of MV 15kV stations and bays for own needs,
  • installation of new compensation chokes, transformers and resistors at auxiliary stations,
  • retrofitting auxiliary bays in the 15 kV switchgear with regulators of follow-up compensation systems.

Two fields at the stations in Kotuń and Łuków.

Share

See more

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total