The building-up of a 110 kV switchgear in the 110 / 15kV GPZ Piotrowiec substation

Elmont Grupa – Infrastruktura Energetyczna

The building-up of a 110 kV switchgear in the 110 / 15kV GPZ Piotrowiec substation for the connection of the “Tolkowiec” Wind Farm with the connection capacity of 48,000kW.

Ordering party: Energa Operator S.A.

Period of implementation: 2014

Scope of works:

  • modernization of a 110 kV switch station consisting in the replacement of switching devices with structures and foundations,
  • replacement of secondary circuits of 110 kV switch station devices,
  • the replacement of overhead busbars in 110 kV switching stations,
  • equipping the 110 kV switching station with a 48 MW wind farm connection station,
  • the equipping of power line inputs at Piotrowiec, Braniewo and Orneta stations with differential protections along with their configuration and commissioning,
  • the disposal of disassembled devices,
  • the updating of operating instructions for modernized stations,
  • the updating of executive design for the development of signalling lists for telemechanics facilities.

Share

See more

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top