In the “design and build” formula, Elektromontaż Wschód has modernized the energy infrastructure at the British American Tobacco plant in Augustów.

The scope of work included:

  • the delivery and assembly of a complete prefabricated building of the GSZ station with a multi-bay MV switchgear,
  • the delivery and assembly of a complete Kormoran substation equipped with a 3-bay medium voltage switchgear,
  • rebuilding of medium and low voltage lines related to the construction of GSZ and Kormoran stations,
  • the supply and installation of power cables necessary to extend the existing supply and discharge lines,
  • the delivery and assembly of lightning protection, grounding and equalizing connections,
  • the post-assembly measurements and installation commissioning.

Share

See more

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total