Modernization of the Traction Substation Mienia and Sosnowe

Elektromontaż Wschód until December 2018 modernized PT Mienia and PT Sosnowe Traction Substations. The works were commissioned by PKP Energetyka.

The scope of work included:

  • the development of complete design documentation with its necessary arrangements,
  • the execution of modernization works in the scope of replacement of ABB production safety devices with C&C production safety devices with adjustment of cabinets with the requirements of the Ordering Party,
  • the replacement of short-circuit protections of the RIs-10 rectifier to uUTXvL,
  • the replacement of current transformers on 1.3kV bridges,
  • as-built measurements,
  • starting the system,
  • as-build documentation.

Share

See more

Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

Energy infrastructure

Energy Storage 400 MWh

Enspro will carry ou the project, obtaining a permit for the construction of the HEP2 Battery Electricity Storage with a capacity of 200MW and a

Farma fotowoltaiczna Elmont
Photovoltaic farms

20 MW PV farm

Elmont is starting the construction of its next high-power photovoltaic farm. This time, at the request of a foreign investor in the Design and Build

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top