Modernization of the Traction Substation Mienia and Sosnowe

Elektromontaż Wschód until December 2018 modernized PT Mienia and PT Sosnowe Traction Substations. The works were commissioned by PKP Energetyka.

The scope of work included:

  • the development of complete design documentation with its necessary arrangements,
  • the execution of modernization works in the scope of replacement of ABB production safety devices with C&C production safety devices with adjustment of cabinets with the requirements of the Ordering Party,
  • the replacement of short-circuit protections of the RIs-10 rectifier to uUTXvL,
  • the replacement of current transformers on 1.3kV bridges,
  • as-built measurements,
  • starting the system,
  • as-build documentation.

Share

See more

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

Farma fotowoltaiczna
Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

See our projects

OZE energia odnawialna, energetyka Elmont Grupa
Scroll to Top