The equipping of the Legionowo HV / MV station with a telemechanics facility controller

Elmont Grupa – Infrastruktura Energetyczna

The equipping of the Legionowo HV / MV station with a telemechanics object controller with reference to the station circuits, activation of connections and communication with the dispatching system.

Ordering party: PGE Dystrybucja S.A.

Period of implementation: 2014

Scope of works:

  • the development of executive documentation for replacement of protections in 110kV switching station,
  • the replacement of protections of the 15kV switchgear and the facility telemechanics of the 110/15 kV Legionowo station,
  • the replacement of protections in 30 bays of 15kV switchgear with digital relays,
  • comprehensive replacement of secondary circuits in 30 bays of 15kV switchgear,
  • performance of configuration and start-up works on new protection relays,
  • exchange of protections in 7 bays of 110 kV switching station,
  • the performance of configuration and start-up works on new protection relays,
  • delivery, assembly and commissioning of the SO-55 telemechanics controller,
  • the execution of complete station telemechanics system with delivery of all materials and devices,
  • configuration and start-up works of the new telemechanics system,
  • development of as-built documentation.

Share

See more

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total