1MW photovoltaic farm

Elmont Grupa – Farmy Fotowoltaiczne

In the south of Poland, Elektromontaż Wschód has built a 1MW photovoltaic power plant. The power plant was included in the auction system. The construction was carried out for one of the largest foreign investors in the photovoltaic industry in Poland. It is one of over several hundred similar investments to be implemented in the near future.

The scope of work included the:

  • preparation of replacement construction documentation,
  • preparation of executive documentation,
  • assembly of supporting structures for photovoltaic modules,
  • assembly of modules and connections between panels,
  • execution of DC wiring,
  • execution of AC wiring,
  • execution of teletechnical wiring,
  • installation and commissioning of video monitoring,
  • assembly and commissioning of a transformer station,
  • assembly of the MV connection,
  • assembly of the fence,
  • execution of the grounding system,
  • performance of measurements and start-up.

Share

See more

Energy infrastructure

RS 110kV 10 months ahead of schedule!

Elmont, commissioned by PGE, has successfully completed the construction of a 110 kV network switchboard for the connection of the Lipińskie Małe Traction Substation. The

Wind farms

6,6 MW Wind Farm

Elmont will execute the Chrośle Wind Farm project with a capacity of 6.6 MW. The scope of work includes the construction of a MV cable

Energy infrastructure

Construction of RS 110 kV Lipińskie Małe

Elmont, on behalf of PGE, has commenced the construction of a 110 kV network substation for the connection of the Lipińskie Małe Traction Substation. The

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total