We have commenced work on another major project in the field of power infrastructure – the preparation of design and cost estimate documentation, and the construction of a two-section, four-bay 110 kV overhead substation, which will connect the Izdebki wind farm to the electricity grid.
Scope of the project:
- two feeder bays,
- one busbar tie bay,
- one feeder bay with the option to expand to include an additional line bay,
- two transformer bays,
- reserved land to allow for the future extension of the building to include a medium-voltage (MV) section.
The proposed substation will be equipped with a system comprising: The new substation will be located near the existing 110 kV Sanok–Trepcza–Dynów line. Two 110 kV cable runs will be laid from the existing power infrastructure to supply the planned Izdebki substation. Completion of the entire contract is scheduled for May 2028.