Elektromontaż Wschód, as a general contractor, will build Traction Substation Dobczyn with power evacuation for railways under the government program MUZA III and MUZA IV.
The scope of work includes:
- construction of internal roads,
- construction of the station’s external fence,
- construction of foundations:
- 110/15 / 1.3 / 1.3 kV transformer stations,
- transformer stations for own needs,
- grounding assembly stations,
- shunt reactor positions,
- foundations and supporting structures for 110kV equipment,
- external sanitary installations and drainage of transformer stations with an oil separator, pump and tank for evaporation of treated drips,
- execution of a water supply connection,
- execution of a sewage connection,
- construction and assembly of installations and outdoor lighting,
- delivery and assembly of devices in a 15kV switchgear,
- making connections between devices in the 15kV switching station,
- delivery and assembly of 110/15 / 1.3 / 1.3 kV transformer and for own needs,
- delivery and assembly of grounding units,
- supply of primary 110kV and secondary 110kV devices,
- assembly of 110kV equipment,
- construction of a 110kV power line with an fibre-optic line,
- cable connections of 3 kV power supplies, return cables, control of disconnectors of the traction network with fibre-optic line,
- rebuilding of the telecommunications cable,
- connection of fibre-optic line to traction substations.