The Elmont Group, commissioned by a foreign investor, will build electricity infrastructure for a 55,2 MW wind farm, which will include 16 wind turbines. The scope of works provides comprehensive implementation in the “Design and build” formula and will include the development of replacement construction and executive designs, construction of the 110 kV cable line and 110 / 30kV GPO station, as well as the extension of the 220/110 / 30kV GPZ station. In addition, we will conduct flow analyzes for the client, start-up the farm in accordance with the NC DC and NC RfG network codes, and perform all operational permit procedures, including for type D power generation modules (EON, ION, FON), in agreement with PSE.
Power FW: 55,2 MW
Number of FW Turbines: 16 x Vestas V126/3,45 MW