Photovoltaic Farm Chwiram 1MW

Elmont Grupa – Farmy Fotowoltaiczne

Elmont Grupa was chosen by the Investor as the General Contractor of a 1 MWp Photovoltaic Plant with the necessary technical infrastructure in Zachodniopomorskie Voivodeship.

The project aims to implement, commissioning and putting into operation a photovoltaic farm, which will consist of over 3,000 stand-alone photovoltaic modules with DC inverters mounted on racks with the structure anchored in the ground, and a grid connection with the installation (including a transformer station container, MV cable, connection to the existing MV 15 kV overhead line).

The deadline for the construction is October 31, 2021.

Share

See more

RS Augustynka - Elmont
Energy infrastructure

RS 110 kV for PV 25MW Augustynka

Elmont, commissioned by PGE, completed the construction of a 110 kV network switchgear for the purpose of connecting the Augustynka photovoltaic farm with a total

Farma fotowoltaiczna
Photovoltaic farms

A 40MW photovoltaic farm in western Poland

Elmont, commissioned by a foreign investor, started the construction of a turnkey photovoltaic farm with a capacity of 40 MWp in western Poland. The farm

Magazyny energii - Enspro - projektowanie
Energy infrastructure

Energy Storage 400 MWh

Enspro will carry ou the project, obtaining a permit for the construction of the HEP2 Battery Electricity Storage with a capacity of 200MW and a

See our projects

OZE energia odnawialna, energetyka Elmont Grupa