Ordering part: PGE Dystrybucja S.A. Branch Białystok
Period of implementation: 2016
Scope of works:
- the development of construction and executive as well as design documentation as agreed with the ordering party,
- obtaining a valid building permit,
- the construction of the HV 110 kV cable line,
- the replacement of existing poles with 110 kV cable poles,
- the assembly of 110 kV cable terminations,
- disassembly of 110 kV poles,
- the measurements of the HV 110kV line and as-built documentation.